Floridian is a premier freehold development with a coastal Miami theme. Its verdant landscape offers a lush yet contemporary setting for strolls and picnics on lawns. Or enjoy a jog through the various-themed gardens interweaved into the grounds as part of the holistic, wellness and lifestyle concept of Floridian.
Located along the prime Bukit Timah Road, Floridian is surrounded by famed local and international educational schools. The nearby Bukit Timah Nature Reserve is perfect for a leisurely stroll in the evenings.
The Downtown Pool is a self-contained enclave, having a 25m Lap Pool complete with a Children’s Pool and a Splash Court. The Club serves as the fulcrum of social interaction for the entire development.
The Keys Pool is a family fun-filled pool that offers new poolside dining experiences in a garden setting. South Beach Pool comprises lushly planted pool alcoves, offering respite from a variety of hydrotherapy jet massages and the hot tub. If not, simply enjoy a massage or a meal in one of the pavilions.
Spa Sanctuary consists of hydrotherapy facilities ranging from Spa Seats, Spa Beds and Bubble Pool complete with multi-use pavilions. The Pier Side is a dedicated gourmet dining court catering to specialty cuisines against a garden setting.
- Reflective Pool at the Verandah
- Splash Court at Fun Land near Wading Pool
- Water Spout Portal
- Water Feature at the Pier side
- Downtown Pool
- Wading Pool
- Keys Pool
- Sunbathing shelf
- South Beach Pool
- Palm Grove Hydrotherapy Pool
- 25m Palm Grove Lap Pool
- Palm Grove Relaxation Pool
- Tennis Court
- Body Sculpting Corners
- The Pier Side
- Palm Grove Outdoor dining
- South Beach Outdoor dining
- Boardwalk
- Jogging track
- Roof Garden
DEVELOPER: ORWIN DEVELOPMENT LTD COMPANY REGISTRATION NO : 199407593M TENURE: FREEHOLD LOT NO. 6502M MK 4 AT BUKIT TIMAH ROAD DEVELOPER’S LICENCE: B1767 BP NO. A1608-00001-2004-BP01 DATED 19.04.2007, A1608-00001-2004-BP02 DATED 10.11.2009 AND A1608-00001-2004-BP03 DATED 03.12.2010 EXPECTED TOP DATE: 31 DECEMBER 2013 EXPECTED DATE OF LEGAL COMPLETION: 31 DECEMBER 2016